What's New? Minimize

Bridge Commission Outlines $14M in Bridge Improvements

Pushes Forward on Capital Program

 read more ...

No Toll Increase on Tac-Pal or Burlington-Bristol Bridges

Commission Introduces Flat Budget

 read more ...

Commission's Latest Shared Service Brings Tactical Police Exercise to Tac-Pal

Sharing Services Among Law Enforcement

 read more ...

Bridge Commission Facilities to Undergo Energy Audits

Then Offer Same Service to Municipalities as Shared Service

 read more ...

Commission Authorizes Assumption of County Economic Development Functions

Expect Seamless Transition, Uninterrupted Service

 read more ...

Bridge Commissioners Forego Salary & Benefits

Agency Measures up to Governor's Reform Plan

 read more ...

Bridge Commission Unveils 2010 Capital Program

Tacony-Palmyra Bridge to Get New Grid Deck

 read more ...

Commission Adopts New Reform Policies

Bi-partisan Support in Sync with Governor's Reform Plan

 read more ...

Tacony-Palmyra Bridge: Living Laboratory for Engineering Students

Drexel Receives Grant for Tacony-Palmyra Bridge to be "Learning Bridge"

 read more ...


    
About Us » About Our Bridges » Tacony-Palmyra Bridge
 Tacony-Palmyra Bridge Minimize

Tacony-Palmyra | Burlington-Bristol | Riverside-Delanco | Minor Bridges

 The Tacony-Palmyra Bridge

Crossing

  • crosses the Delaware River between the cities of Palmyra, New Jersey and Tacony (Philadelphia), Pennsylvania
   

Read More about the Tacony-Palmyra Bridge on our History page

Design/Building

  • designed by Rudolph Modjeski (engineer of the Manhattan Bridge and the Benjamin Franklin Bridge)
  • bridge replaced the existing ferry service, which began operating between Palmyra and Tacony in 1922
  • built by the Tacony-Palmyra Bridge Company after receiving approval from both the United States Congress and the United States War Department

Construction

  • construction began in February 1928
  • bridge opened to traffic August 14, 1929
  • comprised of several different types of structures
    • a through-tied arch at the middle of the river
    • a double-leaf bascule span
    • three-span continuous half through-truss spans
    • deck girder approach viaduct spans 

  Cost

  • in 1928-1929, total cost was approximately $4 million
  • acquired by Burlington County Bridge Commission in 1948
  • no tax money from Burlington County residents is used to maintain this bridge

January 1929: Erection of bascule span, which operates like a balance or seesaw—the rising floor section is counterbalanced by a weight; two rolling lifts power the bascule span.

Specifications

  • total length from abutment to abutment is 3,659 feet
  • bridge is 38 feet wide and carries three lanes of vehicular traffic (two into Philadelphia and one into New Jersey) and also pedestrians across the river.  In 1977, lanes were widened, thus changing from four lanes of vehicular traffic 

Clearance/Openings

  • vertical clearance under main arch span at the center is 61 feet at high tide
  • minimum vertical clearance under bascule span at high tide is approximately 54 feet
  • marine vessels requiring a vertical clearance greater than that of the movable span in its normally closed position must request a bridge opening. The bascule span leaves are raised to permit passage of the vessel and vehicular traffic on the bridge is temporarily stopped until the vessel clears the bridge; the span then resumes its normal lowered position.  

Power/Lights

  • electrical power is supplied by both PSE&G (NJ) and PECO (PA). Submarine cables that were installed underneath the riverbed carry power from one side to the other.
  • both navigation lights and obstruction lights are installed on the bridge at various locations to warn both marine and air traffic of the bridge structure

Maintenance

  • a complete replacement of the original bridge deck and maintenance walkways began in 1996 and was completed in 1998.
  • E-Z Pass/electronic toll collection equipment added in 2003
  • pier E/ u/s interim fender work completed in 2005
  • replacement of steel track plates on the bascule span (the part of the bridge that opens for boat traffic) in 2006
  • bearing replacement project completed in 2007
  • replacement of submarine termination cable boxes on the bascule span in 2007

Opening Day Ceremony, August 14, 1929: NJ Governor Morgan Larson & Philadelphia Mayor Harry Mackey

 Service Times

  • bridge remains in service to the public through all kinds of weather and conditions.
  • one exception—December 1988, when a portion of the arch span was hit by a floating crane boom; this resulted in the bridge being completely closed to vehicular traffic for one month while the required repairs were completed.